OK, its been a loooong time since I've updated. Unfortunatley not much has changed, but I did complete Phase 1 which is unpacking and organizing / arranging everything. I basically have 5 more phases:
Phase 2- skim coat drywall, final sanding and paint walls ceiling (probably going to hire this out)
Phase 3- install lighting in the ceiling (5- 8' 4 bulb and 2 4')
Phase 4- finish the floor (not sure what to do now?)
Phase 5- finsh the "fish area" near the entry door (redo filter, tile wall, etc)
Phase 6- odds and ends (air lines, heater, TV, tool racks, etc)