I had most of the right side of my Tundra painted last month and they said no wax for 30 days. Well, its been a couple days past 30 and want some opinions on whether or not I can go ahead and apply an lsp or if I should wait even longer than recommended? The paintwork turned out really good, but their finishing work left alot to be desired. Lots of marring and quite a bit of pigtails also. Spent more than a few hours correcting it with the Megs 105 and 205 combo. I will probably apply a coat of NXT tech 2.0 followed with 845 either tmrw or later depending on what you all recommend regarding waiting time. Not sure it makes any difference, but this particular shop uses Glasurit branded paint.