HI,
I wanted to see from some of the pros here about what is the average time it should take to say do 1 polish step with PP or SSR1. Say the vehicle is average size like a nissan maxima or BMW 5 series. I ask this because I did a fairly new car the other day with PP and it took about 1.25 hours. I think that is tooooo long and I just am not used to my PC 7424 and these products yet and how long they should be worked before moving on.
PLease give any advice if you could. Thanks!!
I wanted to see from some of the pros here about what is the average time it should take to say do 1 polish step with PP or SSR1. Say the vehicle is average size like a nissan maxima or BMW 5 series. I ask this because I did a fairly new car the other day with PP and it took about 1.25 hours. I think that is tooooo long and I just am not used to my PC 7424 and these products yet and how long they should be worked before moving on.
PLease give any advice if you could. Thanks!!