If I apply a coat of Z2/Z5 can I layer ZCS then Z8 immediatly after?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
DJBAILEY said:The ZCS can be applied right after. (I wait 30-60 minutes after the Z2/Z5 was removed). The Z-8 should wait until the ZCS has had a few hours to cure. I've put Z-8 on after only waiting 1 hour and only had a problem when I also had 3 layers of Z2/Z5 freshly applied underneath the ZCS. That is the only time I've had streaking problems with Z-8. Probably too much polymer for 1 day. If it streaks then mist a MF with Z-6 and wipe it off.
DieselMDX said:If I apply a coat of Z2/Z5 can I layer ZCS then Z8 immediatly after?