dr_detail
Beautification Specialist
I don't do a lot of posting of work, just takes too much of my time (single parent, 3 teenage boys, running own businesses... k - nuff said?) but maybe this will change.... Anyway been doing these trucks for a few years now, Monster, Kawasaki, KTM, Yahama, etc...
These are of truck #2 for this year's MDK team (pic's of #1 & #3 will follow sometime soon). These are Vinyl wrapped and when they apply the wrap, it leaves behind some fairly healthy marring/scratching. After many sessions of testing on scrap pieces over the years I'm happy to say that I've nailed down processes to remove them without damaging, burning, or fading the material.... (don't ask -- I'm calling it a "trade secret") to leave them looking great for the first race of the season. I'll divulge that is a two step process and I do have to break out the Rotary (yes, the rotary). This vinyl unfortunatly, is even scratched by micro-fibers so the first time they brush wash these black beauties at a truck wash, they'll be on their own).
well without further ado... here we go...
(man that's allot of black!)
(side one done....)
(side two half way there... look close under the "MU" and you can make out the scaffolding)
(side two done... )
(little closer of the finished product...)
(thanks Hugo--couldn't do these monstrosities by my self)
We (three of us) also did the cab & wheels.
And, for those who will ask, arrival time 10:30AM -- departure time 4:15PM (includes a 45 minute lunch break).
These are of truck #2 for this year's MDK team (pic's of #1 & #3 will follow sometime soon). These are Vinyl wrapped and when they apply the wrap, it leaves behind some fairly healthy marring/scratching. After many sessions of testing on scrap pieces over the years I'm happy to say that I've nailed down processes to remove them without damaging, burning, or fading the material.... (don't ask -- I'm calling it a "trade secret") to leave them looking great for the first race of the season. I'll divulge that is a two step process and I do have to break out the Rotary (yes, the rotary). This vinyl unfortunatly, is even scratched by micro-fibers so the first time they brush wash these black beauties at a truck wash, they'll be on their own).
well without further ado... here we go...

(man that's allot of black!)

(side one done....)

(side two half way there... look close under the "MU" and you can make out the scaffolding)

(side two done... )

(little closer of the finished product...)

(thanks Hugo--couldn't do these monstrosities by my self)
We (three of us) also did the cab & wheels.
And, for those who will ask, arrival time 10:30AM -- departure time 4:15PM (includes a 45 minute lunch break).