I realize it depends on a whole lot of different factors, but I wanted to get some feedback from others on what their average time range is for different jobs.
For instance:
1-step polish...wash, clay, tape, wheels/wells, 1-step all surfaces, wax, basic interior detail. Light or moderate swirls. 8-10 hours for me in most cases.
2-step polish. Same as above, but going for (close to) full correction on most vehicles. 10-14 hours for me in most cases.
I understand we all do different levels of work, and work on a wide range of vehicles, but please give me some feedback based on what you're used to doing.
Thanks!
For instance:
1-step polish...wash, clay, tape, wheels/wells, 1-step all surfaces, wax, basic interior detail. Light or moderate swirls. 8-10 hours for me in most cases.
2-step polish. Same as above, but going for (close to) full correction on most vehicles. 10-14 hours for me in most cases.
I understand we all do different levels of work, and work on a wide range of vehicles, but please give me some feedback based on what you're used to doing.
Thanks!