This Jeep came to us after it had been sitting for a while as you can tell by the pics. It has just under 300,000 miles so it has been through a lot but is still in great shape.
after pics don't do it justice and look a bit orange. when it clears up I will take better outdoor after pics. still need to give it a final once over so you might see some random smears and smudges.
Products of choice:
105/205 via the makita and dewalt on meguiars wool and foam
D151
#26
#845
3m 1500 6in
misc. ardex products
We weren't looking for perfection when it came to swirl correction the Jeep is getting older and the clear was very thin in spots especially the hood. Some swirling and RIDS remain but overall it was a huge improvement. Minor wet sanding was still needed to get it to where it is now. Probably could have done the same with multiple passes with 105 but sanding was so much quicker.
We took off some of the trim pieces sanded and painted. Also, we took off the wheels and refinished them which made a big difference definitely worth the time invested.
Total time invested exterior only was 8hrs with two guys wokring the whole time.
here are the pics...
lost the host
after pics don't do it justice and look a bit orange. when it clears up I will take better outdoor after pics. still need to give it a final once over so you might see some random smears and smudges.
Products of choice:
105/205 via the makita and dewalt on meguiars wool and foam
D151
#26
#845
3m 1500 6in
misc. ardex products
We weren't looking for perfection when it came to swirl correction the Jeep is getting older and the clear was very thin in spots especially the hood. Some swirling and RIDS remain but overall it was a huge improvement. Minor wet sanding was still needed to get it to where it is now. Probably could have done the same with multiple passes with 105 but sanding was so much quicker.
We took off some of the trim pieces sanded and painted. Also, we took off the wheels and refinished them which made a big difference definitely worth the time invested.
Total time invested exterior only was 8hrs with two guys wokring the whole time.
here are the pics...
lost the host