Hi all,
Let me first say that I am new to autopia having only discovered it about 1 month ago and have found it a wealth of knowledge and information. I have gradually become more 'obsessed' with detailing but i see i am very much a greenhorn compared to many of the devotees on this forum.
Anyway, I recently recieved the Zaino pack for xmas, and did the the whole Dawn, Clay, Z7, AIO, Z1, Z2/Z6 combo (x3).
The car looks good, feels very slick and is beading nicely -- but something is still bothering me...
When I applied the Z2 it seemed to me to dry pretty quickly (almost instant). In fact I could have sworn the first section was dry by the time i did the entire car (20+ minutes?)
Now judging from the posts here and on all the instructions everywhere it is supposed to take a long time to dry? The instructions that came with the pack said to wait at least 1 hour, from memory other instructions i found on the web suggest to wait 6+ hours if in the sun or over 60oF or up to 24 hours if humid.
As I had the luxury of leaving the car in the garage over xmas I took no chances [I left each coat at least a whole night (8 hours) to dry and the whole day (12+ hours) to cure after wiping before applying another coat. ]. However, for future coats I will not be so fortunate.
Now is this 'instant' drying time I witnessed typical? I am from Australia and it is summer here so most days it was around 25oc (77oF) and overnight even with rain outside it would average around 15oc (59oF). I was pretty sure it was dry as I ran my finger through a hazed section and it appeared to come off 'crystal clear'. The only reason I didn't buff immediately was I knew I had time to leave it, just in case. I wasn't too skimpy on the polish either, the 2nd time around I made a concerted effort to form hazing using up about 1/2-3/4 ounces for a small-medium sized car. Any thoughts/opinions? Mainly is this drying time typical for my conditions or is this not realistic and could I not judging it being dry properly? - There did not appear to be any smearing whatsoever, it was a silver car under artificial lights so anything is hard to see but i shone various bright torches on it and looked from various angles.
One final thing, I doubt i have the Z2Pro formula? My Z2 bottle, whilst pinkish liquid has a red cap, and was ordered from a distributor in Australia in December, so I would assume a typical lag time in distribution overseas.
Let me first say that I am new to autopia having only discovered it about 1 month ago and have found it a wealth of knowledge and information. I have gradually become more 'obsessed' with detailing but i see i am very much a greenhorn compared to many of the devotees on this forum.
Anyway, I recently recieved the Zaino pack for xmas, and did the the whole Dawn, Clay, Z7, AIO, Z1, Z2/Z6 combo (x3).
The car looks good, feels very slick and is beading nicely -- but something is still bothering me...
When I applied the Z2 it seemed to me to dry pretty quickly (almost instant). In fact I could have sworn the first section was dry by the time i did the entire car (20+ minutes?)
Now judging from the posts here and on all the instructions everywhere it is supposed to take a long time to dry? The instructions that came with the pack said to wait at least 1 hour, from memory other instructions i found on the web suggest to wait 6+ hours if in the sun or over 60oF or up to 24 hours if humid.
As I had the luxury of leaving the car in the garage over xmas I took no chances [I left each coat at least a whole night (8 hours) to dry and the whole day (12+ hours) to cure after wiping before applying another coat. ]. However, for future coats I will not be so fortunate.
Now is this 'instant' drying time I witnessed typical? I am from Australia and it is summer here so most days it was around 25oc (77oF) and overnight even with rain outside it would average around 15oc (59oF). I was pretty sure it was dry as I ran my finger through a hazed section and it appeared to come off 'crystal clear'. The only reason I didn't buff immediately was I knew I had time to leave it, just in case. I wasn't too skimpy on the polish either, the 2nd time around I made a concerted effort to form hazing using up about 1/2-3/4 ounces for a small-medium sized car. Any thoughts/opinions? Mainly is this drying time typical for my conditions or is this not realistic and could I not judging it being dry properly? - There did not appear to be any smearing whatsoever, it was a silver car under artificial lights so anything is hard to see but i shone various bright torches on it and looked from various angles.
One final thing, I doubt i have the Z2Pro formula? My Z2 bottle, whilst pinkish liquid has a red cap, and was ordered from a distributor in Australia in December, so I would assume a typical lag time in distribution overseas.