I just got some DWG which I will top with UPGP.
I will be using a foam applticator by hand with the DWG. I know how much DWG to use from their directions and this forum, as well as how to apply and remove.
My question is - should I leave the foam applicator dry or should I moisten it for the DWG application?
I will be using a foam applticator by hand with the DWG. I know how much DWG to use from their directions and this forum, as well as how to apply and remove.
My question is - should I leave the foam applicator dry or should I moisten it for the DWG application?