about 700 would get it a two step...a de-oxidizer and a wax...about 500 would get it a onestep...
i did a 37' rv pretty much by myself with a pc, lots of cutting pads, and megs 66, then topped with megs 21..results were really good! i was hating life after spending 17 hours, but it was worth it