Well my new years resolution was to actually get something done in the garage instead of just thinking and wishing. So since it was 60* outside on the first of January I decided to get crack'n .
And for anybody thinking about doing this, I say jump in head first. It's a pretty straight forward and easy job. It took me about 6 hrs to lay the tile and most of that was waiting for the adhesive to tack up, and cutting the trim pieces.
Total cost $180 and a 12 pack! So, for your viewing pleasure...
Materials:
Before
After:
And for anybody thinking about doing this, I say jump in head first. It's a pretty straight forward and easy job. It took me about 6 hrs to lay the tile and most of that was waiting for the adhesive to tack up, and cutting the trim pieces.
Total cost $180 and a 12 pack! So, for your viewing pleasure...
Materials:

Before

After:
