I PC'ed my black car today with the Menzerna Twins. Mind you, it's a small car too. To do the roof and the hood ONLY, it took me from 10am to 6pm. I used the Menzerna IP with a LC yellow pad set at 4, and the Menzerna FP with a LC white pad also at 4. Even though it took a while for the IP to break down into powder, I'm still confused as to whether or not taking 8 hours to do 2 sections sounds right??
I don't know if I would want raise the RPM on the PC with the yellow pad since the LC yellow pad will marr the surface. Then that would only leave the option of...spending more time with the white pad and taking longer than 8 hours to do only 2 sections.
Please help a tired enthusiast
I don't know if I would want raise the RPM on the PC with the yellow pad since the LC yellow pad will marr the surface. Then that would only leave the option of...spending more time with the white pad and taking longer than 8 hours to do only 2 sections.
Please help a tired enthusiast
