Richie's Custom Detailing
New member
This beautful LP 640 belongs to a very good long time client. He picked it up a few months ago and decided it was time for a full paint correction.
He wanted it dialed in for our local Cars and Coffee this past Saturday.
I pulled out all the stops which meant an all nighter since I was unable to start on this car until the day before.
I washed the car the night before so I could have as much time as possible for the correction.
I started the correction process at 8:00am Friday and finished 6:00am Saturday.
When I arrived Thursday evening:
Made it a little easier to clean the front wheel wells:
Sorry for the lack of wash pics, I was losing sunlight fast.
These are some of the defects I was able to capture, all parts of the car was covered in DA sand scratches, holograms and RIDS:
Corrected:
More defects:
Before:
After:
Couple of afters as the sun was going down Friday evening. No LSP applied.
Tail lights were not immune to abuse:
50/50:
After:
He wanted it dialed in for our local Cars and Coffee this past Saturday.
I pulled out all the stops which meant an all nighter since I was unable to start on this car until the day before.
I washed the car the night before so I could have as much time as possible for the correction.
I started the correction process at 8:00am Friday and finished 6:00am Saturday.
When I arrived Thursday evening:



Made it a little easier to clean the front wheel wells:


Sorry for the lack of wash pics, I was losing sunlight fast.


These are some of the defects I was able to capture, all parts of the car was covered in DA sand scratches, holograms and RIDS:



Corrected:

More defects:



Before:

After:

Couple of afters as the sun was going down Friday evening. No LSP applied.



Tail lights were not immune to abuse:

50/50:



After:
